Regis University Athletic Facilities

The Regis Fieldhouse was finished in 1960 and has a seating capacity of 2,000.

The Regis Fieldhouse was built in 1960 and currently seats 2,000 spectators.  The Fieldhouse features locker rooms, an indoor 25-meter swimming pool, athletic training facilities and the Newland Center.  All the Athletic Department's administrative offices are located in the fieldhouse.  There have been numerous conference and regional tournament games played within the walls of the fieldhouse.

Regis Baseball Field

 

 

 

 

 

 

 

 

The Regis Baseball Field is located just outside the back doors of the Regis Fieldhouse.  It is entirely natural grass and has seating for about 750 spectators, but has more space along the first and third base line where people can bring lawn chairs or blankets and enjoy the beautiful Colorado weather.  The facility also has a concession stand and a press box.